Imperial College
Fuel Cell
Project Name : Fuel Cell
Location : Kensington CampusValue : £510k Mechanical, £160k Electrical
Fuel Cell is located in the Royal School of Mines and the contract was construction of a Mezzanine floor creating a new plant room, 2 X Fuel Cell labs, MAS Spectrometre Lab and a General Laboratory.
Mechanically this included fume extracts system, Heating & Ventilation, Specialist gases domestic water & waste services, Air Conditioning, M&E control system and full BMS to operate with the existing college system.
Electrically we installed a new architectural lighting system, small power, new power distribution system, access control as well as fire alarm and data.
This project was completed on time and within budget.
Copyright © W&L Installations LTD 2011
Proudly powered by Blankspacesolutions
Proudly powered by Blankspacesolutions









